Join JoLynn Berge, Seattle Public Schools (SPS) Assistant Superintendent of Business and Finance, to learn about the 2022 SPS Levies. Seattle voters will be asked to consider two education funding measures in the Feb 2022 election. These measures are education levies that continue funding to help support student success by creating a safe, equitable learning environment. Schools First will also join the meeting to share how you can support the campaign.
Registration: https://us06web.zoom.us/meeting/register/tZMuc-2qqjkrGNMQDrGUweyPCfHTb-A0jhSN
This meeting will be recorded. When the recording is uploaded to Facebook, this blog post will be updated with the link. For faster updates, please Like the FB page.
Schools First Translated One-Pagers can be found at the bottom of this post.
The proposed BTA V Capital Levy includes funding for a three classroom, Pre-k addition to John Muir Elementary School and 23 building and field maintenance projects at 14 schools in the southeast region of SPS. Building system and repair projects include earthquake safety improvements, fire alarm replacement, new fire suppression installation, roof improvements, and playground replacements. Proposed athletics improvements include new synthetic turf at Rainier Beach High School and new grass field and learning garden at Maple Elementary School. More information on the levies can be found at https://www.seattleschools.org/about/levy .
Type | School | Project |
ES | Beacon Hill | Roof improvements |
ES | Dearborn Park | Upgrade water distribution system |
ES | Emerson | Earthquake safety improvements |
ES | Graham Hill | Roof improvements |
ES | John Muir | John Muir 3-Classroom Addition for Early Learning |
ES | John Muir | Fire alarm system replacement |
ES | Maple | Provide new fire suppression system |
ES | Maple | Fire alarm system replacement |
ES | Rising Star | Playground replacement and improvements |
ES | Rising Star | Improvements to school’s exterior cladding |
ES | Rising Star | Improvements to school’s exterior windows |
ES | Rising Star | Replace intercom/clock system |
ES | Thurgood Marshall | Fire alarm system replacement |
K-8 | Whitworth (Orca K-8) | Heating system improvements |
K-8 | Whitworth (Orca K-8) | Fire alarm system replacement |
HS | Alan T. Sugiyama | Create suitable toddler playground equipment |
HS | Columbia (Interagency) | Improvements to school’s exterior doors |
HS | Franklin | Confirm functionality, repair and clean storm water collection systems; seal and stripe asphalt areas. |
HS | Franklin Gym | Heating system improvements |
HS | Franklin Gym | Fire alarm system replacement |
HS | Franklin Gym | Resurface and stripe parking lot south of gym; improve stormwater infiltration; card key access; new fence; new curb bumpers; replace lighting |
Interim Site | Van Asselt (1950s Bldg.) | Heating system improvements |
BS& R Total | ||
Athletics | ||
HS | Rainier Beach | Replacement of existing synthetic turf at the auxiliary field & stadium, tennis court paving, seating & fencing. |
ES | Maple | New grass playfield, asphalt exercise path, amphitheater, and learning garden. |